I’ve been working on combining my “C” benchwork concept into a “double” t-trak module. I used 1/8″ masonite with plywood blocks for this build. In hindsight I would have used something thicker and lighter like 1/2″ thick foamcore (maybe). First step was to cut alot of strips for the C’s (not show in the pics). […]
